Regular Inspection And Maintenance Time Of Granulator

Regular Inspection And Maintenance Time Of Granulator
 

We all know that mechanical equipment, including many objects, metals, etc. used in daily life, all require regular maintenance. So in this issue, we will give you a detailed analysis of the twin-screw extruder for the production and processing section. At different times, different methods of maintenance are used at different times, which can be used as a reference for everyone. Come with me to learn more, I hope it can help everyone.

 

Regular inspection and maintenance time of twin-screw extruder

When operating a twin-screw extruder every day, you should check:
Check temperature, pressure control and heating systems during operation
Check the screw tail seal when the equipment is in operation
Make adjustments and replacements if necessary.

news-648-486

Maintenance and inspection time of twin-screw extruder

 

1

Every 2000 hours of operation:
Check whether the installation and function of the heater are appropriate and whether the screws are loose
If necessary, check all heating and cooling lines, exhausts, flange connections and valves for leaks and sealing conditions
Check the screw tail seal when the equipment is operating, and make appropriate adjustments or replacements if necessary.
Check temperature and pressure controls during operation

Every 6000 operating hours:
Pull out the screw, remove the threaded components and back cap, check their wear, corrosion and damage, and replace damaged parts. Use special high temperature resistant mounting oil when reinstalling threaded components

Check twin-screw extruder temperature and pressure controls

Replace sealing ring

Remove the heater, clean the connection surface, reinstall and test its function to ensure proper installation. Use special high-temperature resistant grease for installation.
Check the heating and cooling connecting pipes, exhaust devices, flanges and valves for leaks and whether the sealing condition is good.

 

The above is to summarize for you the parts that should be checked every day during operation, the parts that should be checked every 2000H of operation, the parts that should be checked every 6000 hours of operation, etc., which can be used for your reference. Our company will update new articles every week, many New products, product knowledge, operation methods, and many details will be summarized for everyone. We also hope that we can help everyone. Nanjing Kelongweier Chemical Machinery Co., Ltd.(COLOWE) Thanks you for your support.

 

 